Augen Design was subcontracted to design and construct the secure courtyard area at the Carnarvon Police and Justice Complex. There were extreme logistic difficulties that we overcame to achieve a very timely installation of both the structural steel supports and GKD Tigris mesh. Based on our Solidworks 3D drawings, we were able to supply and transport a meccano kit to Carnarvon, along with a crane and installation team. The 3D drawings allowed us to pre-assemble in a simulated environment and follow through with a trouble free successful installation.
Back to ProjectsProject Information
- Project Location: Carnarvon Police and Justice Complex
- Products Used: GKD Tigris ,
- Architect: Cox Architecture
- Builder: EMCO